Hyderabad is now enforcing a 2012 rule barring building permission on residential plots under 20 feet wide. If you own or are buying a narrow plot, that's a problem nobody prices.

Started by Vrinda Bhatia

The Telangana government has begun strictly enforcing a building rule that has existed since 2012 but was applied loosely until now. It bars building permission for residential plots less than 20 feet wide. The change is that the BuildNow software was set to reject non-compliant applications automatically, so what used to be negotiable at a counter became a hard stop.

That triggered protests, mainly in the Old City, where a great many houses sit on plots of 60 to 70 square yards with road-facing widths below 20 feet. The software wouldn't accept applications even to reconstruct existing old buildings. Officials defend the rule on the grounds that it stops larger plots being carved into unbuildably small ones, with the usual consequences of narrow lanes, drainage problems and construction that can't be inspected properly. A MAUD official was quoted saying some developers had been subdividing plots specifically to get around the mortgage requirement, though I couldn't verify the mechanics of that and won't guess at them.

After the protests, the software was changed again. It now accepts applications, but final approval depends on a site inspection.

Three things follow from this if you're buying.

Width is a separate question from area, and almost nobody checks it. Two plots of the same 100 square yards can sit on opposite sides of this rule depending on frontage. The price per square yard you're quoted says nothing about whether you can build.

An old house on a narrow plot may be a structure with an end date rather than a redevelopment opportunity. If reconstruction permission isn't available, what you're buying is the remaining life of the existing building, and the land underneath it is worth considerably less than a comparable buildable plot. That gap is not usually in the asking price.

And the current position is unstable in a way that cuts against buyers. An automatic software rejection is at least predictable. Discretionary approval after a site inspection is slower, less certain, and harder to plan a purchase or a loan around. Treating "the application was accepted" as "permission will come" would be a mistake right now.

Practically: measure the road-facing width yourself before you commit, and for any plot near the threshold, ask what the sanctioned plan for the existing structure actually permits.

Replies (1)

Raghav Jaiswal

Worth separating which permission tier these plots actually sit in, because it changes what the rejection means. Under TG-bPASS, now BuildNow, a plot up to 75 square yards with ground or ground plus one residential construction needs no building permission and no occupancy certificate at all. The ap