Maharashtra Housing And Area Development Authority
Browse 11 projects by Maharashtra Housing And Area Development Authority in Borivali, Mumbai, Thane, 11 RERA-registered. Status, RERA details and buyer discussions.
Projects by Maharashtra Housing And Area Development Authority
- Construction of 86 Tenements out of 430 MIG tenements of old Magathane village Borivali — Borivali — RERA: P51800000063
- Constn of 219 Ts and 172 MIG Ts on CTS No 128 A 12 Pt at Mahaveer nagar Kandivali W Mumbai — Borivali — RERA: P51800000040
- Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH -V, Mumbai — Mumbai — RERA: PR1170002600192
- SURVEY NO 162 VILLAGE KHONI TAL KALYAN — Thane — RERA: P51700016831
- Plotted Development Scheme at Sindhudurhnagari, Oras, Tal- Kudal, Dist- Sindhudurg — Andheri — RERA: P51800008115
- Plot No.2 — Borivali — RERA: P51800000019
- Planning, Designing, Constuction and Obtaining Necessary Approvals for 72 HIG t/s on lumpsum Turnkey — Andheri — RERA: P51800000041
- Plot No 3 Charkop Sector 8 — Borivali — RERA: P51800000017
- Constructing EWS and LIG Tenements under PMAY on S No 86 95 and 133 at Shirdhon Tal Kalyan DistThane — Thane — RERA: P51700016820
- Const Of 586 Ews 234 Mig Tenaments On Land Bearing Cts No 1 C 1 1 Borivali West Mumbai 67 — Borivali — RERA: P51800008549
- 64 LIG, 80 MIG, 16HIG and 20 Shops at Sr. No. 491, Res. No. 23 Part, Vengurla, Dist. Sindhudurg — Andheri — RERA: P51800002323
RERA extension record
2 of this builder's 11 Maharashtra RERA registrations on file were granted an extension of the completion date (Covid-period blanket extensions not counted); the typical extension is 66 months and the longest 72 months. An extension is more time granted by the regulator on the promoter's application, not a finding that a project was handed over late.